How deep does your renovation go?
Not every renovation is the same. Whether you want a fresh coat of paint or a full strip: we adapt our approach to your situation.
Refresh
The structure and systems remain untouched. You give your home a new face without heavy interventions.
- Painting
- New floors
- Kitchen or bathroom renewal
- Door and baseboard replacement
Every layer, outside to inside
In a full renovation, we renew your home layer by layer. Click a layer to see exactly what happens there.
Grants, loan and 6% VAT
What you get back depends on your income category. Category 4 (the lowest incomes) gets 50 percent of the invoice excluding VAT back, category 3 gets 35 percent, each with a maximum per type of work. Since 1 March 2026, categories 1 and 2 only get a grant for a heat pump or heat pump water heater.
You apply for Mijn VerbouwPremie within 2 years of the last invoice, for a home connected to the grid before 1 January 2006. Status on 18 October 2026.
- Cat. 4
- 5,750 euros
- Cat. 3
- 4,025 euros
- Cat. 1 and 2
- none
- Cat. 4
- 5,000 euros
- Cat. 3
- 3,500 euros
- Cat. 1 and 2
- none
- Cat. 4
- 6,000 euros
- Cat. 3
- 4,500 euros
- Cat. 1 and 2
- 1,500 euros
Step by step to label A
Every intervention brings your home closer to label A. Below you can see which measure takes you to the next level, including estimated cost and savings.
Apply roof insulation
Install external wall insulation
High-performance glass and new windows
Heat pump (6% VAT) or condensing boiler (21% VAT)
Floor insulation and ventilation system D
What happens when?
A renovation is an organized process. We plan every phase so you know what is coming and how long it takes.
Site survey and design
2 to 4 weeksWe inspect your home, take measurements and together create a renovation plan. Asbestos inventory if needed.
Strip and demolition
1 to 3 weeksEverything that does not stay is removed: floors, ceilings, pipes, windows. After stripping we see the actual state of the structure.
Structural works
2 to 4 weeksFoundation repair, modify load-bearing walls, install lintels, possible extension or roof works.
System installation
3 to 5 weeksElectrical (AREI-compliant), plumbing, heating and ventilation are completely renewed and connected.
Insulation and joinery
2 to 4 weeksRoof, walls and floor are insulated. New windows and doors are installed. The home becomes wind and watertight.
Finishing and handover
4 to 8 weeksPlastering, screed, floors, painting, kitchen and bathroom installation. Final inspection and handover.
Where does your budget go?
Transparency about costs matters. Below you can see how a typical renovation budget is distributed.
When do you choose which?
Both options have advantages and disadvantages. The right choice depends on your budget, the condition of the home and your long-term plans.
How many of these signs do you recognize?
Everything you want to know about renovating

Ready to transform your home?
Tell us about your renovation plans. We visit, analyze the situation and create a tailored proposal.
Cost calculator
Calculate your price
Pick the floor area and finish level and get a first price range straight away. The type of work is already filled in.
- 01Type of workFull Renovations
- 02Floor area
- 03Finish level
- 04Extras
Often goes together