Brick new build villa with large windows, built by SN Group in Ghent
All ServicesBuilt for generations

From the first groundwork to the key in your hand: we build homes that stand the test of time. No hidden costs, no compromises.

Request a Quote
07Finishing6 to 10 weeks
06Systems4 to 6 weeks
05Exterior1 to 2 weeks
04Shell8 to 16 weeks
03Groundwork2 to 4 weeks
02Permit2 to 4 months
01Preliminary Study2 to 4 weeks
What is new construction?

Building from scratch, exactly as you envision it

New construction means your home is built entirely from scratch on an empty plot or after demolition of an existing building. Unlike renovation, you determine the layout, materials and energy performance of your home yourself.

In Belgium, every new build must comply with EPB regulations (Energy Performance and Indoor Climate). This determines minimum insulation values, the energy level (E-level) and ventilation requirements. We ensure your home not only meets but exceeds the legal minimum.

Whether you choose a classic home, a modern architect-designed house or a compact passive house: the construction process always follows the same fixed phases. Below we walk you through each of those steps.

The building process

7 phases from groundwork to handover

A new build takes an average of 10 to 14 months. Each phase builds on the previous one. Below you can see exactly what happens when and how long each step takes.

01

Preliminary Study & Design

Together with your architect we analyze the plans, soil conditions and orientation of your plot. We optimize technical feasibility and prepare a detailed quotation.

Including soil investigation, structural study and EPB preliminary study. We coordinate with the architect to ensure the design is structurally and financially viable.

Duration2 to 4 weeks
Preliminary Study & Design
1/7
Building Methods

Three methods, each with their own strengths

The choice of construction method influences build time, cost, insulation values and architectural possibilities. We advise based on your priorities.

Traditional masonry

The proven method that has been applied in Belgium for centuries. Brick by brick built with a reinforced concrete structure. Maximum design flexibility and proven durability.

Traditional masonry
Speed2/5
Insulation3/5
Cost3/5
Flexibility5/5
Lifespan5/5

Advantages

  • Very durable: lifespan of over 100 years
  • Fully flexible in design and layout
  • Excellent sound insulation through mass
  • High thermal mass retains heat

Considerations

  • Longer build time due to wet processes
  • Weather dependent: frost and rain delay work
  • More construction waste on site
Energy & Comfort

Nearly Zero-Energy: the standard for every new build

Since 2021, every new build in Flanders must meet the BEN standard (Nearly Zero-Energy Building). This means strict requirements for insulation, airtightness and energy performance. The result: a home that barely uses energy and feels comfortable all year round.

BEN stands for Nearly Zero-Energy Building. In practice this means your home is so well insulated and equipped that the remaining energy consumption can come from renewable sources. Think of a heat pump combined with solar panels.

  • Up to 70% lower energy costs compared to a 2005 home
  • Constant indoor comfort: 20 to 22 degrees all year
  • Higher resale value through energy label A
  • Flemish premiums up to 5,000 euros for E-level below E20
E-levelE30
The lower, the more energy-efficient your home is. Calculated based on insulation, systems and renewable energy.max E30
S-levelS28
Overheating risk. A low S-level means your home does not overheat in summer without air conditioning.max S28
K-levelK25
Global insulation level of the entire building envelope. Walls, roof, floor and windows combined.max K40
Airtightness3 m3/h.m2
Maximum allowed air leak measured at a pressure test of 50 Pascal. The lower, the less heat loss.max 6 m3/h.m2
What is included?

From foundation to handover: everything included

With a turnkey project by SN Group, everything is included. No hidden costs, no unexpected surcharges. Below is a complete overview of what you get.

Permits

Environmental permit: we handle it

No new construction can start without a permit. In Flanders this is called the environmental permit. The application is digital via the Environment Desk and has a standard period of 60 days.

1

Pre-consultation

Together with the architect we discuss the plans with the urban planning department of your municipality. This prevents surprises during the formal application.

2

Submit dossier

The architect submits the complete dossier via the Environment Desk: plans, structural study, EPB start declaration and appendices.

3

Public inquiry

The municipality organizes a public inquiry of 30 days. Neighbors and other stakeholders can file objections.

4

Decision

The municipal council decides within 60 days (simple procedure) or 120 days (special procedure).

5

Start works

After approval and the expiry of the appeal period (35 days), works can start. We set up the site and plan the first phase.

Craftsmanship

Every aspect of your home, by our team

Shell & Facade
01

Shell & Facade

The skeleton of your home. Foundation, masonry, floor slabs and facing brick. Whether render, glued brick or traditional masonry: it stands for life.

Meer informatie
Windows & Doors
02

Windows & Doors

The connection to outside. High-performance glazing in aluminum, wood or PVC. Airtight installed by the book for maximum insulation.

Meer informatie
Systems & Ventilation
03

Systems & Ventilation

The comfort you do not see but feel. Ventilation system D, heat pumps, underfloor heating and air conditioning. Everything is integrated during the shell phase.

Meer informatie
Floors & Finishing
04

Floors & Finishing

The finishing touch. Ceramic tiles, natural stone or polished concrete. We screed and floor with laser precision for a flawless result.

Meer informatie
Investment

What does new construction cost in Belgium?

The cost of new construction depends on size, building method, finishing level and technical systems. Below is a realistic indication.

01

Shell (wind and watertight)

1,200 to 1,500 euros/m2

Shell, roof, exterior carpentry. No systems or finishing.

Request a Quote
02

Standard finishing

1,500 to 1,900 euros/m2

Shell, systems, plastering, screed, basic kitchen and bathroom.

Request a Quote
03

Turnkey

1,800 to 2,400 euros/m2

Everything included: shell, systems, full finishing, kitchen, bathroom, painting.

Request a Quote

Prices are indicative for 2024-2025 and depend on your specific requirements. Always request a custom quotation.

Frequently asked questions

New Builds

Ready to start?

Discuss your project and receive a clear quote for